Credentials & standing

Taking part of a building down is harder than taking all of it down. Selective demolition demands precision: remove exactly what the plans call for, protect everything that stays, and keep the structure, the schedule, and the neighbors intact.
Here's the step that separates a professional selective demolition from an expensive mistake: in buildings of pre-1980s vintage — and many newer ones — the materials you're about to demolish may contain asbestos. Floor tile and mastic, drywall joint compound, plaster, ceiling texture and tiles, pipe and duct insulation: all common, all regulated once disturbed. The federal asbestos NESHAP regulation requires a thorough asbestos inspection before demolition and before renovations that will disturb threshold amounts of suspect material. Skipping it risks regulatory enforcement, contaminated debris, exposed workers, and a stopped job.
ES America closes that gap structurally: we hold EPA/AHERA/ASHARA certification #20616 and state asbestos licenses in Georgia (ASBRN-382008), South Carolina (CO-000859), and Alabama (ASB40262). We perform the pre-demolition survey, complete any required asbestos clearance and abatement, and then execute the selective demolition — one contractor, one schedule, no finger-pointing between the abatement sub and the demo sub. For full structural takedowns, see our demolition services.
ES America has spent since 2009 working inside the buildings where selective demolition is riskiest: older commercial stock, institutional facilities, and occupied properties. We're licensed, bonded ($1M/$3M), and insured, and we bring abatement-grade discipline — containment, documentation, air-quality awareness — to every strip-out, not just the regulated ones.

We walk the project with your plans — what comes out, what stays, what gets protected — and assess access, utilities, and building age.

Suspect materials in the work area are sampled and analyzed before anyone swings a hammer. If abatement is required, it's scoped, priced, and scheduled into the same project.

Scope, exclusions, protection plan, debris disposition, and timeline — documented so GCs and owners can hold us to it.

Dust barriers, floor and finish protection, negative air where appropriate, and clear separation from occupied areas.

Material hauled and disposed of properly (recyclables diverted where practical), with a clean, documented handoff to the trades that follow.

Controlled, sequenced removal — utilities safed off, structure protected, debris managed off the floor daily.
Full demolition takes the entire structure down. Selective demolition removes specific elements while protecting what remains — it requires more planning, more protection, and more controlled means and methods.

Interiors, additions, walls, and slabs removed surgically — utilities safed off, the remaining structure protected, dust and noise controlled, and occupied areas kept operating.
The entire structure comes down. For complete takedowns, see our demolition services — including the NESHAP-required pre-demolition asbestos inspection.

When the demo sub is also the licensed asbestos contractor, surprise findings become a change order, not a shutdown.
From single-suite tenant-improvement demo to partial structural removals — scoped, protected, and documented.

Full gut of interior finishes — drywall, ceilings, flooring, casework, MEP removals as scoped — taking the space back to shell or structure for the build-out that follows.

Demising wall removal, storefront and office reconfigurations, and phased demolition in occupied buildings, coordinated with property management and performed with dust and noise control.

Removing a wing, an addition, a mezzanine, or selected structural elements while protecting the remaining structure — plus openings for new stairs, elevators, and storefronts; slab cuts and penetrations; and careful removal around elements slated for preservation.

Do I need an asbestos inspection before interior demolition?
In most cases, yes. The federal asbestos NESHAP requires an inspection before demolition and before renovations that disturb threshold quantities of suspect material — and many buildings, even relatively recent ones, contain asbestos in finishes like floor tile, mastic, or joint compound. Testing first is faster and cheaper than discovering it mid-job.
What happens if asbestos is found during the strip-out?
With ES America, work in the affected area stops and our own licensed abatement crews handle the material under proper containment — then demolition resumes. You don't lose weeks sourcing and mobilizing a separate abatement contractor.
Can you work in an occupied building?
Yes. Occupied-building TI demolition is core work for us: dust barriers, negative air where appropriate, after-hours scheduling, and coordination with property management to keep tenants operating.
What's the difference between selective demolition and full demolition?
Full demolition takes the entire structure down. Selective demolition removes specific elements — interiors, additions, walls, slabs — while protecting what remains. It requires more planning, more protection, and more controlled means and methods.
Do you provide documentation for permits and project files?
Yes — written scopes, the pre-demolition asbestos survey, abatement records where applicable, and disposal documentation for your closeout package.
Planning a strip-out, TI, or partial demolition? Call ES America at (404) 994-6006 or email services@es-america.com for a scope review and written proposal anywhere in Georgia, South Carolina, or Alabama.