Under the Asbestos Hazard Emergency Response Act (AHERA), every Georgia public school district, charter school and private nonprofit K-12 school must have each school building reinspected by an EPA-accredited inspector at least once every 3 years. The reinspection reassesses all known and assumed asbestos, and the results must be added to the school’s asbestos management plan.
At a glance
- Georgia asbestos contractor license ASBRN-382008 (GA EPD)
- Serving Georgia, South Carolina and Alabama since 2009; insured $1M/$3M
- Cost guide: asbestos removal cost in Georgia
When is my school’s AHERA reinspection due?
Your reinspection is due no later than 3 years after the last one. The clock runs per building, so a district with buildings inspected in different years can have several due dates.
The fastest way to find yours is to open the management plan kept at your district office and look for the date of the last reinspection report. You can also use the reinspection calculator on our AHERA inspection and compliance page.
Many Georgia districts schedule reinspections for summer, when buildings are empty. If your due date falls in the 2027 school year, now is the time to budget and book it.
What happens during an AHERA reinspection?
An AHERA reinspection follows the steps in 40 CFR 763.85(b):
- Visual reinspection of all friable and nonfriable known or assumed asbestos-containing building material (ACBM).
- Touching friable ACBM to check whether it has become damaged or deteriorated.
- Sampling any newly found suspect materials, if the school wants them tested rather than assumed.
- Reassessment of the condition of each friable material and its potential for disturbance.
- A written report with the date, the inspector’s name and accreditation, any changes in condition, and recommendations.
After the reinspection, an accredited management planner reviews the results and updates the management plan, including any recommended response actions.
Who can perform an AHERA reinspection in Georgia?
Only an EPA-accredited asbestos inspector can perform an AHERA reinspection, and only an accredited management planner can update the management plan with the results. Ask any provider for current accreditation certificates before you sign.
If the reinspection leads to removal, repair or encapsulation work, that work must be done by an asbestos contractor licensed by the Georgia Environmental Protection Division (EPD).
What if our reinspection is overdue?
Schedule it now and update the management plan right after. Overdue reinspections are one of the most common findings in AHERA compliance inspections, and AHERA violations can carry civil penalties under the Toxic Substances Control Act (TSCA).
Being late does not mean starting over. A reinspection done today brings the building back on schedule, and the next one is due 3 years later.
How is a reinspection different from 6-month surveillance?
A reinspection is the full 3-year review by an accredited inspector. Periodic surveillance is a simpler condition check of known asbestos every 6 months, which trained staff can do. Both are required. Read more in our guide to AHERA 6-month periodic surveillance.
A simple reinspection checklist for designated persons
- Find the date of the last reinspection for each building.
- Confirm who is accredited to do the next one and to update the plan.
- Make sure new buildings or additions have their own initial inspection.
- Check that 6-month surveillance records are filed in the plan.
- Send the annual notification to parents, teachers and employee organizations.
Download the full one-page AHERA compliance checklist for designated persons.
FAQ
Is the 3-year reinspection required for every building?
Yes. It applies to every school building that contains known or assumed ACBM. Buildings with no asbestos still need the records that prove it.
Can we combine the reinspection with the management plan update?
Yes, and it is the usual approach: the inspector reinspects, then the management planner updates the plan with the results.
How long does an AHERA reinspection take?
It depends on the number and size of buildings. Most single schools take one day on site; larger districts are scheduled building by building.
Get your reinspection on the calendar
Environmental Services of America (ES America) performs AHERA reinspections and management plan updates for schools in Georgia, South Carolina and Alabama, with EPA-accredited inspectors and an accredited management planner, since 2009. Request a quote and you will have it in 2 business days, or call (404) 994-6006.